Home Language Imprint Terms of Use www.bosch.com    
Bosch Rexroth
Great Britain
Products and Solutions
Products
Automation
Electric Drives and Controls
Industrial Hydraulics
About Industrial Hydraulics
Products & Solutions
Markets & Applications
Service
Contact Us
Linear Motion and Assembly Technology
Mobile Hydraulics
Pneumatics
Industries
Customer Service
Training
Downloads
Company
About Rexroth
Contact
Trade Fairs and Events
Press
Jobs and Careers
Search Search   Contact Contact   Sitemap Sitemap  
image x  


Civil Engineering

UK Civil Reference List

Significant Projects

Year Location / Project Name Description 
2008 Cumberland Basin, Bristol Docks Turnkey refurbishment of water hydraulics. 
 Lagan Weir, Belfast Fishbelly Gate refurbishment 
2007 Minworth Radial gate control system 
2006 A12 Bascule bridge Lowestoft Turnkey refurbishment of complete bridge controls 
2004 Iraq Bascule Bridges 2off complete control system including 4 off 18 tonne winches, containerised power packs and complete electrical control system. 
 Yalding Bascule Bridge 1 off complete control system including HPU, cylinders and piping 
2003 Electro Impact Wing Jig Installation, for A380 Airbus 4 off jigs in total complete ring main system each comprising of HPU, 170 manifold assemblies and 340 cylinders 
 Port of Dover Double Deck Ro Ro Berths 8 & 9 2 – off complete sets of hydraulic cylinders for main, secondary deck, spragging and finger flap cylinders. 
2002 Port of Holyhead Double Deck Ro Ro Berth 5 1 – off complete set of hydraulic cylinders for main, secondary deck, spragging and finger flap cylinders. 
2001 Port of Dublin 1 – off complete set of control cylinders and 4000 litre hydraulic power unit for upper vehicle deck 
2000 Port of Hull 1 – off complete set of control cylinders and containerised power unit for passenger walkway “King George Dock”. 
1999 Port of Belfast 1 – off complete set of control cylinders and loose equipment for double deck Ro Ro. 
1994 Isle of Man Ro Ro Bridge complete set of hydraulic cylinders and power units. 


Bridges

Year Location / Project Name Description 
2003 Bascule Bridge Canary Wharf, London 2 – off Hydraulic power units for jacking system on 25m Bascule Bridge. 
2001 Tower Bridge London Complete refurbishment of hydraulic mechanical and electrical control system. 
1997 Ennerdale Bascule Bridge, Hull Complete hydraulic and electrical turnkey system. 
1995 Trowse rail bridge Complete refurbishment of hydraulic and electrical control system. 
1991 Stoneferry Bascule Bridge, Hull Complete hydraulic and electrical turnkey system. 


Other Civil Systems

Year Location / Project Name Description 
2006 Cardiff Flood Barrage 4 off complete gate control manifold systems 
2005 Thames Flood Barrage Pump control upgrade systems 
2004 Cardiff Flood Barrage 2 off complete gate control manifold systems 
 Portland Mitre gates, Weymouth Complete Hydraulic control system including HPU, cylinders and piping 
 Shoreham Mitre gates, Brighton 4 off Hydraulic Power packs 
2003 Forth Road Bridge Maintenance Vehicles 6-off sets of hydraulic power units and motor manifolds. 
2002 Anderton Ship Lift Complete hydraulic and electrical control turnkey system. 
Civil Engineering

Applications

Tower Bridge

UK Reference List

Back
 
 
go to top of page | Print | Create PDF